Date Add
Input
| value |
|---|
Add 1 years to value
transformation:dateAdd
Add a duration to a date field
source:value
parameters
- amount
- unit
- inputFormat
- outputFormat
How much time to add or subtract from the source date (used together with unit).
Time unit paired with amount.
How the source field date string is parsed before the calculation.
How the calculated date is formatted when written to the output field.
Output
| value |
|---|
| 2025-01-15 |
| 2025-06-01 |
| 2024-12-31 |
| 2025-02-28 |
| invalid-date |
Sample inputs run locally in your browser using the same operation logic as Fontana Flow.
Results are illustrative, not connected to a workflow.
Add a duration to a date field.
Parameters
- amount (Amount, number, required) — How much time to add or subtract from the source date (used together with unit). Examples:
1,7,30. - unit (Unit, string, required) — Time unit paired with amount. Allowed values:
years,months,weeks,days,hours,minutes,seconds. - inputFormat (Input format, string, optional) — How the source field date string is parsed before the calculation. Examples:
"yyyy-MM-dd","MM/dd/yyyy","dd-MM-yyyy". - outputFormat (Output format, string, optional) — How the calculated date is formatted when written to the output field. Examples:
"yyyy-MM-dd","MM/dd/yyyy","dd-MM-yyyy".
Field selection
- source — Field whose values this operation reads. Omit to apply to all fields on the row.
- target — Optional output field. When omitted, the source field is updated in place.
JSON Configuration
{ "id": "op-dateAdd", "type": "transformation", "action": "dateAdd", "params": { "inputFormat": "yyyy-MM-dd", "outputFormat": "yyyy-MM-dd", "amount": 1, "unit": "years" }, "testInputs": [ "2024-01-15", "2024-06-01", "2023-12-31", "2024-02-29", "invalid-date", "" ]}